QELNAVOR

Hanbury Site Package — Utilities

89.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Groundworks — the invisible half of forever

Sites decide budgets more than buildings do; the Hanbury decides them early — utilities trenched tidily where chosen, drainage planned before the first plank, and no surprises invoiced as adventures.

Foundations are forever's first draft. We survey, specify and install — screws for reversibility, pads for mass, decking platforms that ventilate — and hand over a base plumb enough to make the rest of the build boring.

Design & Craft

  • Utilities trenched tidily where chosen
  • Crane days and crew logistics included as stated
  • Frames levelled to millimetres, documented
  • Load documentation shipped with the works
  • Installed by the same crew that raises the building

Specifications

Scope Survey + utilities trenching
Crane Logistics included as stated
Drainage Planned pre-build
Promise Tidier than found, written
Weight ≈ 268 kg
Warranty 5 years on groundworks

Care

Nothing to do — that is the point. Check decking board gaps stay clear of debris each autumn, and re-torque visible fixings at year one. Ground screws can be inspected, adjusted or reused if the pavilion ever moves.

Questions, Answered

Ground screws or concrete?
Screws install in a day, ventilate the frame and can be reused; concrete suits mass and slopes. The survey decides with you — reversibility is worth wanting.

Is the platform ventilated?
Always — timber lives long when air moves beneath it. Skirting options keep hedgehogs out and airflow in.

The QELNAVOR Promise

Every QELNAVOR pavilion is engineered for its address: snow and wind loads calculated to Eurocode EN 1991 for Czech zones, foundations specified to your ground, and the structural documentation shipped with the order.