{"product_id":"hanbury-site-package-utilities","title":"Hanbury Site Package — Utilities","description":"\u003cp\u003e\u003cem\u003eQELNAVOR Groundworks — the invisible half of forever\u003c\/em\u003e\u003c\/p\u003e\u003cp\u003eSites decide budgets more than buildings do; the Hanbury decides them early — utilities trenched tidily where chosen, drainage planned before the first plank, and no surprises invoiced as adventures.\u003c\/p\u003e\u003cp\u003eFoundations are forever's first draft. We survey, specify and install — screws for reversibility, pads for mass, decking platforms that ventilate — and hand over a base plumb enough to make the rest of the build boring.\u003c\/p\u003e\u003ch3\u003eDesign \u0026amp; Craft\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003eUtilities trenched tidily where chosen\u003c\/li\u003e\n\u003cli\u003eCrane days and crew logistics included as stated\u003c\/li\u003e\n\u003cli\u003eFrames levelled to millimetres, documented\u003c\/li\u003e\n\u003cli\u003eLoad documentation shipped with the works\u003c\/li\u003e\n\u003cli\u003eInstalled by the same crew that raises the building\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eSpecifications\u003c\/h3\u003e\u003ctable\u003e\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eScope\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eSurvey + utilities trenching\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eCrane\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eLogistics included as stated\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eDrainage\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003ePlanned pre-build\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003ePromise\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eTidier than found, written\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eWeight\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e≈ 268 kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eWarranty\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e5 years on groundworks\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\u003c\/table\u003e\u003ch3\u003eCare\u003c\/h3\u003e\u003cp\u003eNothing to do — that is the point. Check decking board gaps stay clear of debris each autumn, and re-torque visible fixings at year one. Ground screws can be inspected, adjusted or reused if the pavilion ever moves.\u003c\/p\u003e\u003ch3\u003eQuestions, Answered\u003c\/h3\u003e\u003cp\u003e\u003cstrong\u003eGround screws or concrete?\u003c\/strong\u003e\u003cbr\u003eScrews install in a day, ventilate the frame and can be reused; concrete suits mass and slopes. The survey decides with you — reversibility is worth wanting.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eIs the platform ventilated?\u003c\/strong\u003e\u003cbr\u003eAlways — timber lives long when air moves beneath it. Skirting options keep hedgehogs out and airflow in.\u003c\/p\u003e\u003ch3\u003eThe QELNAVOR Promise\u003c\/h3\u003e\u003cp\u003eEvery QELNAVOR pavilion is engineered for its address: snow and wind loads calculated to Eurocode EN 1991 for Czech zones, foundations specified to your ground, and the structural documentation shipped with the order.\u003c\/p\u003e","brand":"QELNAVOR","offers":[{"title":"Default Title","offer_id":54409467494727,"sku":"QEL-SIPA-006-01","price":89000.0,"currency_code":"CZK","in_stock":true}],"url":"https:\/\/www.qelnavor.com\/products\/hanbury-site-package-utilities","provider":"QELNAVOR","version":"1.0","type":"link"}