Pivonka Site Package
Tax included where applicable. Delivery and commissioning arranged by your concierge.
QELNAVOR Groundworks — the invisible half of forever
Sites decide budgets more than buildings do; the Pivonka decides them early — utilities trenched tidily where chosen, drainage planned before the first plank, and no surprises invoiced as adventures.
Every pavilion stands on the part nobody photographs: ground screws or pads sized to your soil, frames levelled to millimetres, and drainage planned before the first plank arrives. Our groundworks ship with load documentation and are installed by the same crew that raises the building.
Design & Craft
- Survey, levels, membranes and access in one scope
- The garden left tidier than found — in writing
- Ground screws or pads sized to your soil at survey
- Load documentation shipped with the works
- Drainage planned before the first plank
Specifications
| Scope | Survey + levels + access |
| Crane | Logistics included as stated |
| Drainage | Planned pre-build |
| Promise | Tidier than found, written |
| Weight | ≈ 161 kg |
| Warranty | 5 years on groundworks |
Care
Nothing to do — that is the point. Check decking board gaps stay clear of debris each autumn, and re-torque visible fixings at year one. Ground screws can be inspected, adjusted or reused if the pavilion ever moves.
Questions, Answered
Can you build on a slope?
Yes — stepped screw layouts and platform framing make slopes ordinary. The load documentation covers the specific geometry.
Is the platform ventilated?
Always — timber lives long when air moves beneath it. Skirting options keep hedgehogs out and airflow in.
The QELNAVOR Promise
Five years on the structure, two on moving parts, fifteen years of parts on the shelf — glass units, hardware, louvres, shingles and finials included.