QELNAVOR

Altanka Deck Platform

72.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Groundworks — the invisible half of forever

Slopes are where gardens get interesting and builders get quiet; the Altanka speaks up — stepped framing that makes gradients ordinary, and load documentation covering the exact geometry underfoot.

Every pavilion stands on the part nobody photographs: ground screws or pads sized to your soil, frames levelled to millimetres, and drainage planned before the first plank arrives. Our groundworks ship with load documentation and are installed by the same crew that raises the building.

Design & Craft

  • Slopes made ordinary by stepped framing
  • Installed by the same crew that raises the building
  • Load documentation shipped with the works
  • Ground screws or pads sized to your soil at survey
  • Decking platforms that ventilate timber to old age

Specifications

Format Level platform, plan-sized
Ventilation Engineered underfloor air
Skirting Hedgehog-out, airflow-in
Gaps Heel-true, draining
Weight ≈ 866 kg
Warranty 5 years; boards stocked 15

Care

Keep platform ventilation gaps open, sweep rather than pressure-wash oiled decking, and call us before any landscaping that changes drainage. Foundations prefer being ignored correctly.

Questions, Answered

What site preparation is needed?
Access for the crew, a power point nearby, and honesty about the ground. Everything else — levels, drainage, membranes — is our scope and stated in the package.

Is the platform ventilated?
Always — timber lives long when air moves beneath it. Skirting options keep hedgehogs out and airflow in.

The QELNAVOR Promise

Every QELNAVOR pavilion is engineered for its address: snow and wind loads calculated to Eurocode EN 1991 for Czech zones, foundations specified to your ground, and the structural documentation shipped with the order.