Aranjuez Estate Pavilion — Lantern Roof
Tax included. Shipping calculated at checkout.
QELNAVOR Classics — the garden's formal bow
The Aranjuez is built for weddings and long anniversaries: estate-scale spans, a double-layer roof with ventilated lantern, and carving programmes that can carry a monogram into the next generation.
A pavilion is carpentry asked to behave like architecture, and it is built that way: glued-laminated spruce and European larch machined to joinery tolerances, traditional mortise-and-tenon connections reinforced with concealed steel, and roofs framed for real Czech snow rather than brochure winters. Every structure ships with its Eurocode EN 1991 load calculation — the drawing is part of the product.
Design & Craft
- Loads calculated to Eurocode EN 1991 for Czech snow and wind zones
- Hand-laid shingle roofs over ventilated battens
- Glulam spruce and European larch, joinery-grade machining
- Stainless fixings; pre-oiled finish in your chosen tone
- Statutory 24-month warranty
- Mortise-and-tenon frames reinforced with concealed steel
Specifications
| Format | 6 × 8 m + ventilated lantern |
| Roof | Double-layer, shingled |
| Carving | Programme to commission |
| Assembly | Self-assembly; installation not included |
| Loads | EN 1991, CZ zones stated |
| Weight | ≈ 4921 kg |
| Warranty | Statutory 24 months under Czech law |
Care
Brush pollen and dust seasonally, keep planting a hand's width off the timber, and let ventilation do its quiet work. The care card states the finish and the re-oiling interval.
Questions, Answered
Can it be moved later?
Ground-screw foundations make relocation genuinely practical — a careful crew of two, a crane day, and re-anchoring per the instructions. Pavilions should follow their families.
How long does installation take?
Foundations one day, structure one to three days by size — stated per listing. Assembly is the customer's responsibility; plan it with your installer.
The QELNAVOR Promise
Pavilions ship crated with the manufacturer's instructions, anchor specifications and glazing plans — dimensions and foundation requirements stated up front.