QELNAVOR

Bellagio Grill Pavilion

189.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Classics — the garden's formal bow

The Bellagio keeps the fire in the family all year: a grill pavilion with engineered smoke outlet, heat-shielded roof details, spark-safe floors and benches planned around the cook rather than squeezed beside them.

A pavilion is carpentry asked to behave like architecture, so we build it that way: glued-laminated spruce and European larch machined to joinery tolerances, traditional mortise-and-tenon connections reinforced with concealed steel, and roofs framed for real Czech snow rather than brochure winters. Every structure ships with its Eurocode EN 1991 load calculation — the drawing is part of the product.

Design & Craft

  • Grill pavilions with smoke outlet engineered, not improvised
  • Glulam spruce and European larch, joinery-grade machining
  • Foundations set, structure raised and levelled by our crews
  • Mortise-and-tenon frames reinforced with concealed steel
  • Loads calculated to Eurocode EN 1991 for Czech snow and wind zones
  • 5 years structure, 2 on moving parts; parts stocked 15

Specifications

Format Grill pavilion, smoke outlet
Safety Heat shields, spark-safe floor
Fittings Benches, counters, log store
Certificates Stove/chimney in pack
Loads EN 1991, CZ zones stated
Weight ≈ 1403 kg
Warranty 5 yr structure, parts 15

Care

Brush pollen and dust seasonally, keep planting a hand's width off the timber, and let ventilation do its quiet work. The care card states the finish and interval; our crews offer a re-oiling service by subscription.

Questions, Answered

Timber or aluminium?
Timber warms the eye and asks for oil every few years; aluminium disappears politely and asks for water. Both carry the same engineering; the choice is temperament, and we will advise honestly.

How long does installation take?
Foundations one day, structure one to three days by size — stated per listing. Our crews assemble, level and hand over, and the garden is tidier than we found it.

The QELNAVOR Promise

Every QELNAVOR pavilion is engineered for its address: snow and wind loads calculated to Eurocode EN 1991 for Czech zones, foundations specified to your ground, and the structural documentation shipped with the order.