QELNAVOR

Cetinale Pavilion 4×6 — Fete

152.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Classics — the garden's formal bow

The Cetinale hosts the long table: a rectangular timber pavilion with clear-span trusses that keep the middle of the party open, sides that configure from airy to sheltered, and bays that extend when the family does.

Timber earns trust by the decade: heartwood-graded larch and cedar, shingles laid by hand over ventilated battens, pre-oiled surfaces that weather to silver or stay nut-brown by your choice, and stainless fixings throughout. Ten years from now the pavilion should need a fresh coat of oil and nothing else — that is the engineering brief.

Design & Craft

  • Railings, balustrades and open sides configurable
  • Foundations set, structure raised and levelled by our crews
  • Extends later by honest modular bays
  • Stainless fixings; pre-oiled finish in your chosen tone
  • Hand-laid shingle roofs over ventilated battens
  • 5 years structure, 2 on moving parts; parts stocked 15

Specifications

Plan 4 × 6 m
Trusses Clear-span, open middle
Sides Open / railing / part-wall
Timber Glulam spruce + larch
Loads EN 1991, CZ zones stated
Weight ≈ 2016 kg
Warranty 5 yr structure, parts 15

Care

Brush pollen and dust seasonally, keep planting a hand's width off the timber, and let ventilation do its quiet work. The care card states the finish and interval; our crews offer a re-oiling service by subscription.

Questions, Answered

How long does installation take?
Foundations one day, structure one to three days by size — stated per listing. Our crews assemble, level and hand over, and the garden is tidier than we found it.

Can it be moved later?
Ground-screw foundations make relocation genuinely practical — a crew, a crane day, and re-certification. Pavilions should follow their families.

The QELNAVOR Promise

Pavilions are commissioned, not delivered. Our crews set the foundations, assemble, glaze, level and hand over — and take every scrap of packaging away.