Este Estate Pavilion — Lantern Roof
Tax included where applicable. Delivery and commissioning arranged by your concierge.
QELNAVOR Classics — the garden's formal bow
Every park deserves one building guests photograph; the Este is it — ballroom manners under shingles, crane day and site engineering included, and the quiet certainty of Eurocode drawings behind the romance.
A pavilion is carpentry asked to behave like architecture, so we build it that way: glued-laminated spruce and European larch machined to joinery tolerances, traditional mortise-and-tenon connections reinforced with concealed steel, and roofs framed for real Czech snow rather than brochure winters. Every structure ships with its Eurocode EN 1991 load calculation — the drawing is part of the product.
Design & Craft
- Loads calculated to Eurocode EN 1991 for Czech snow and wind zones
- Site engineering and crane day included
- 5 years structure, 2 on moving parts; parts stocked 15
- Hand-laid shingle roofs over ventilated battens
- Double-layer roofs with ventilated lanterns
- Stainless fixings; pre-oiled finish in your chosen tone
Specifications
| Format | 6 × 8 m + ventilated lantern |
| Roof | Double-layer, shingled |
| Carving | Programme to commission |
| Install | Crane day + crews included |
| Loads | EN 1991, CZ zones stated |
| Weight | ≈ 4088 kg |
| Warranty | 5 yr structure, parts 15 |
Care
Re-oil exposed timber every two to three years — one weekend, supplied oil — and clear roof gutters each autumn. Check fixings at year one, then forget them. Shingles and finials are stocked parts; storms are repaired, not mourned.
Questions, Answered
Timber or aluminium?
Timber warms the eye and asks for oil every few years; aluminium disappears politely and asks for water. Both carry the same engineering; the choice is temperament, and we will advise honestly.
Can it be moved later?
Ground-screw foundations make relocation genuinely practical — a crew, a crane day, and re-certification. Pavilions should follow their families.
The QELNAVOR Promise
Five years on the structure, two on moving parts, fifteen years of parts on the shelf — glass units, hardware, louvres, shingles and finials included.