QELNAVOR

Kopretina Deck Platform

107.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Groundworks — the invisible half of forever

Slopes are where gardens get interesting and builders get quiet; the Kopretina speaks up — stepped framing that makes gradients ordinary, and load documentation covering the exact geometry underfoot.

Every pavilion stands on the part nobody photographs: ground screws or pads sized to your soil, frames levelled to millimetres, and drainage planned before the first plank arrives. Our groundworks ship with load documentation and are installed by the same crew that raises the building.

Design & Craft

  • Load documentation shipped with the works
  • Frames levelled to millimetres, documented
  • Skirting keeps hedgehogs out, airflow in
  • Installed by the same crew that raises the building
  • Board gaps set for heels and honest drainage

Specifications

Format Level platform, plan-sized
Ventilation Engineered underfloor air
Skirting Hedgehog-out, airflow-in
Gaps Heel-true, draining
Weight ≈ 713 kg
Warranty 5 years; boards stocked 15

Care

Keep platform ventilation gaps open, sweep rather than pressure-wash oiled decking, and call us before any landscaping that changes drainage. Foundations prefer being ignored correctly.

Questions, Answered

Ground screws or concrete?
Screws install in a day, ventilate the frame and can be reused; concrete suits mass and slopes. The survey decides with you — reversibility is worth wanting.

What site preparation is needed?
Access for the crew, a power point nearby, and honesty about the ground. Everything else — levels, drainage, membranes — is our scope and stated in the package.

The QELNAVOR Promise

Paperwork, handled: most garden pavilions in CZ need only a simple notification, and our drawings and documentation pack turn it into a formality.