QELNAVOR

Lednice Deck Platform — Slope

34.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Groundworks — the invisible half of forever

Slopes are where gardens get interesting and builders get quiet; the Lednice speaks up — stepped framing that makes gradients ordinary, and load documentation covering the exact geometry underfoot.

Every pavilion stands on the part nobody photographs: ground screws or pads sized to your soil, frames levelled to millimetres, and drainage planned before the first plank arrives. Our groundworks ship with load documentation and are installed by the same crew that raises the building.

Design & Craft

  • Drainage planned before the first plank
  • Frames levelled to millimetres, documented
  • Installed by the same crew that raises the building
  • 5 years on groundworks; adjustable forever
  • Slopes made ordinary by stepped framing

Specifications

Format Slope platform, stepped
Ventilation Engineered underfloor air
Skirting Hedgehog-out, airflow-in
Gaps Heel-true, draining
Weight ≈ 1315 kg
Warranty 5 years; boards stocked 15

Care

Keep platform ventilation gaps open, sweep rather than pressure-wash oiled decking, and call us before any landscaping that changes drainage. Foundations prefer being ignored correctly.

Questions, Answered

Can you build on a slope?
Yes — stepped screw layouts and platform framing make slopes ordinary. The load documentation covers the specific geometry.

Ground screws or concrete?
Screws install in a day, ventilate the frame and can be reused; concrete suits mass and slopes. The survey decides with you — reversibility is worth wanting.

The QELNAVOR Promise

Every QELNAVOR pavilion is engineered for its address: snow and wind loads calculated to Eurocode EN 1991 for Czech zones, foundations specified to your ground, and the structural documentation shipped with the order.