QELNAVOR

Marlia Screw Foundation Kit

57.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Groundworks — the invisible half of forever

Forever starts underground; the Marlia drafts it politely — levelled to millimetres, documented for the structure above, and reusable because good foundations should follow good buildings.

Foundations are forever's first draft. We survey, specify and install — screws for reversibility, pads for mass, decking platforms that ventilate — and hand over a base plumb enough to make the rest of the build boring.

Design & Craft

  • 5 years on groundworks; adjustable forever
  • Installed by the same crew that raises the building
  • Adjustable heads forgive seasons and settling
  • Frames levelled to millimetres, documented
  • Reusable when pavilions follow families

Specifications

Kit Screws + heads for mid pavilions
Install One day, no concrete
Heads Adjustable, documented
Reversible Yes — reusable
Weight ≈ 106 kg
Warranty 5 years on groundworks

Care

Nothing to do — that is the point. Check decking board gaps stay clear of debris each autumn, and re-torque visible fixings at year one. Ground screws can be inspected, adjusted or reused if the pavilion ever moves.

Questions, Answered

Is the platform ventilated?
Always — timber lives long when air moves beneath it. Skirting options keep hedgehogs out and airflow in.

Can you build on a slope?
Yes — stepped screw layouts and platform framing make slopes ordinary. The load documentation covers the specific geometry.

The QELNAVOR Promise

Pavilions are commissioned, not delivered. Our crews set the foundations, assemble, glaze, level and hand over — and take every scrap of packaging away.