QELNAVOR

Meudon Pool House

366.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Water — bathing, roofed and robed

Summers organise themselves around a good pool house; the Meudon organises beautifully — bar and fridge bays planned rather than improvised, and a lounge that keeps its manners in permanent humidity.

Water rooms are built from the materials that forgive it: thermowood and cedar for sauna interiors, stainless and brass where hands are wet, floors that drain by design, and ventilation sized so towels dry and timber lasts. Stove and glass options carry their certificates in the pack.

Design & Craft

  • Ventilation sized so towels dry and timber lasts
  • Thresholds without tripping ceremonies
  • Chlorine-air-proof finishes and hinges
  • Commissioned by our crews, water and power connected
  • Certificates for stoves and glass in the pack
  • Thermowood and cedar where heat and water live

Specifications

Format Pool house, 4 × 5 m
Zones Wet, dry lounge, towel store
Finishes Chlorine-air-proof
Bays Bar + fridge planned
Loads EN 1991, CZ zones stated
Weight ≈ 3774 kg
Warranty 5 yr structure, parts 15

Care

Ventilate after every session, oil thermowood benches twice a year, and rinse floors with clean water. Stove stones and gaskets are stocked; the care card lists the sauna's simple weekly ritual.

Questions, Answered

Is the pool house insulated?
Year-round models are, and say so; summer pavilions breathe instead. Changing rooms and showers state their frost strategy honestly.

What does the sauna run on?
Electric stoves as standard, wood-fired where chimneys allow — both with certificates in the pack. Heat-up times and consumption are stated per model.

The QELNAVOR Promise

Pavilions are commissioned, not delivered. Our crews set the foundations, assemble, glaze, level and hand over — and take every scrap of packaging away.