Ninfa Grill Pavilion — Hearth
Tax included where applicable. Delivery and commissioning arranged by your concierge.
QELNAVOR Classics — the garden's formal bow
Rain has cancelled enough barbecues; the Ninfa retires the excuse — counters and log stores in the plan, chimney options certified in the pack, and timber detailed to live beside honest fire.
A pavilion is carpentry asked to behave like architecture, so we build it that way: glued-laminated spruce and European larch machined to joinery tolerances, traditional mortise-and-tenon connections reinforced with concealed steel, and roofs framed for real Czech snow rather than brochure winters. Every structure ships with its Eurocode EN 1991 load calculation — the drawing is part of the product.
Design & Craft
- Glulam spruce and European larch, joinery-grade machining
- Chimney and stove options certified in the pack
- Benches, counters and log stores planned into the plan
- Heat-shielded roof details and spark-safe floors
- Stainless fixings; pre-oiled finish in your chosen tone
- Grill pavilions with smoke outlet engineered, not improvised
Specifications
| Format | Hearth pavilion + chimney |
| Safety | Heat shields, spark-safe floor |
| Fittings | Benches, counters, log store |
| Certificates | Stove/chimney in pack |
| Loads | EN 1991, CZ zones stated |
| Weight | ≈ 2561 kg |
| Warranty | 5 yr structure, parts 15 |
Care
Re-oil exposed timber every two to three years — one weekend, supplied oil — and clear roof gutters each autumn. Check fixings at year one, then forget them. Shingles and finials are stocked parts; storms are repaired, not mourned.
Questions, Answered
How long does installation take?
Foundations one day, structure one to three days by size — stated per listing. Our crews assemble, level and hand over, and the garden is tidier than we found it.
Timber or aluminium?
Timber warms the eye and asks for oil every few years; aluminium disappears politely and asks for water. Both carry the same engineering; the choice is temperament, and we will advise honestly.
The QELNAVOR Promise
Pavilions are commissioned, not delivered. Our crews set the foundations, assemble, glaze, level and hand over — and take every scrap of packaging away.