QELNAVOR

Slunecnice Pool House

495.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Water — bathing, roofed and robed

The Slunecnice is the pool's front-of-house: wet zone, dry lounge and towel store in one poolside logic, finishes that shrug off chlorine air, and thresholds without tripping ceremonies.

Pool pavilions live in permanent humidity, so ours assume it — ventilated roof builds, glass that shrugs off chlorine air, and thresholds without tripping ceremonies. The luxury is that nothing swells, sticks or stains by August.

Design & Craft

  • Thresholds without tripping ceremonies
  • Poolside logic: wet zone, dry lounge, towel store
  • Certificates for stoves and glass in the pack
  • Stainless and brass hardware; floors that drain by design
  • Bar and fridge bays planned, not improvised
  • Commissioned by our crews, water and power connected

Specifications

Format Pool house, 4 × 5 m
Zones Wet, dry lounge, towel store
Finishes Chlorine-air-proof
Bays Bar + fridge planned
Loads EN 1991, CZ zones stated
Weight ≈ 3652 kg
Warranty 5 yr structure, parts 15

Care

Wipe brass and stainless dry where water sits, keep drains free of leaves, and let the room breathe between uses. Humidity is the design condition — neglect is the only enemy.

Questions, Answered

How is water handled?
Showers plumb to your drainage or to a soak-away we specify; saunas need none. Our groundworks crew handles both in the same visit.

How private is it?
Screens, orientation and glazing choices are planned at survey — bathing should feel like the garden's best secret, not its stage.

The QELNAVOR Promise

Every QELNAVOR pavilion is engineered for its address: snow and wind loads calculated to Eurocode EN 1991 for Czech zones, foundations specified to your ground, and the structural documentation shipped with the order.