QELNAVOR

Tempietto Garden Sauna — Panorama

224.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Engineered for the addressEurocode EN 1991 documentation ships with the order.
Founded & raised by our crewsFoundations, assembly, glazing — packaging gone.
Tended for decadesFive-year structure; parts stocked fifteen years.

QELNAVOR Water — bathing, roofed and robed

The Nordic habit settles beautifully into Bohemian gardens; the Tempietto settles it — electric or wood-fired by chimney reality, ventilation that keeps timber decades-young, and a changing porch where winter waits outside.

Pool pavilions live in permanent humidity, so ours assume it — ventilated roof builds, glass that shrugs off chlorine air, and thresholds without tripping ceremonies. The luxury is that nothing swells, sticks or stains by August.

Design & Craft

  • Panorama glass option faces the garden, not the fence
  • Stainless and brass hardware; floors that drain by design
  • Electric or wood-fired stoves, certified in the pack
  • Heat-up times and consumption stated honestly
  • Ventilation sized so towels dry and timber lasts
  • Thermowood and cedar where heat and water live

Specifications

Format Panorama sauna, 3 × 4.5 m
Stove Electric or wood-fired, certified
Benches Knot-free thermowood
Heat-up Stated per stove
Loads EN 1991, CZ zones stated
Weight ≈ 3149 kg
Warranty 5 yr structure, stove 2

Care

Ventilate after every session, oil thermowood benches twice a year, and rinse floors with clean water. Stove stones and gaskets are stocked; the care card lists the sauna's simple weekly ritual.

Questions, Answered

How is water handled?
Showers plumb to your drainage or to a soak-away we specify; saunas need none. Our groundworks crew handles both in the same visit.

Is the pool house insulated?
Year-round models are, and say so; summer pavilions breathe instead. Changing rooms and showers state their frost strategy honestly.

The QELNAVOR Promise

Pavilions are commissioned, not delivered. Our crews set the foundations, assemble, glaze, level and hand over — and take every scrap of packaging away.